Tensioning cables inside one of the pre-cast concrete groin ribs in the East Cavern. (CM007, 9-21-2017) (36742083104)
by MTA Capital Construction Mega Projects
20 of 79 from this camera
Shot on
Ricoh WG-305mm · f/3.5 · 1/13s · ISO 1600
Details
- Focal length
- 5 mm
- Aperture
- f/3.5
- Shutter
- 1/13s
- ISO
- 1600
- Taken
- September 21, 2017
Credit and licence
View on Wikimedia CommonsLicence: CC BY 2.0. The photograph remains the work of its photographer.